Illustrations continued
RESTRICTEDXIV
Fig.Page
Eccentric Disc and Dove Tail42114
Apparent Easterly Precession and
North Hook43115
Bombsight Assemblies44124
Motor Half Rate End Disassembly45130
Stoning Gears46148
Cleaning Gears47148
Cleaning Bearings48150
Checking Bearings for Dirt and
Flat Spots49150
Checking Disk Speed50152
Installation of Telescope Cable,
M-4s and up51156
Zeroing the Roller52158
Precession (Leveling) Knobs53138
Wiring Changes in Order to
Render the A.E.S. Inoperative54168
M-6 Sight Without A.E.S.55170
M-9 Sight and Stabilizer56172
M-9 Bombsight Wiring Diagram57174
M-9 Stabilizer Wiring Diagram58176
Set Pedestal Reference Index59180
Establish Grid Line True Heading60182
Alignment of Vertical Hair61183
Synchronize The Trail Arm with The
Cross Trail Mechanism62184
Align Dove Tail63184
Level Head of Stand64186
Level Stabilizer65188
Gyro Erected To Vertical66190
Erection of Optics To Vertical67192
Quadrants Driving Toward Release68210
Bombsight Cover Type A-169230
